Client: Diliweg Companies
Location: Durham, NC
Diliweg companies contacted us about repairs trails that were build incorrectly by a landscaping company. Due to the lack of experience, the landscaping company that attempted to install their trails routed the paths poorly and cause severe erosion of the surface materials. In addition, the trails were routed across a low lying field with significant water flow and as a result, the poor trail design created a dam that turned the field into a marsh that never dried.
Our solution was to change trail alignments where possible, install timber steps where needed, and install substantial subsurface French drain systems throughout the field portion to redirect the water underground. Check out the before, during, and after photos to see the progress!